Abstract
In the contractual business, construction firms are generally more concerned with short-term financial strategies than the longterm ones. Working capital management is the central issue of all short-term financial concerns. Thus, it's urgent to study the cash portion of working capital management to rationalize the amount of cash and current assets possessed in certain time. The S-curve is quite suitable to represent the relationship between project duration and complete progress in practical usage of construction management. Based on the technique of Takagi-Sugeno (T−S) fuzzy model, the fuzzy regression model is constructed for curve fitting problems. According to the cash flow of the example projects, this paper develops a practical S-curve regression model demonstrated and given tentative conclusions.
Recommended Citation
Hsieh, Ting-Ya; Wang, Morris Hsiao-Lung; and Chen, Cheng-Wu
(2004)
"A Case Study of S-Curve Regression Method to Project Control of Construction Management via T-S Fuzzy Model,"
Journal of Marine Science and Technology: Vol. 12:
Iss.
3, Article 10.
DOI: 10.51400/2709-6998.2241
Available at:
https://jmstt.ntou.edu.tw/journal/vol12/iss3/10